North Vancouver City Library

North Vancouver, BC  ·  Middle Years Area Renovation

Quiet zone of the Middle Years area at North Vancouver City Library, with shelving counters, globe pendants and a striped feature wall.
Group study tables with green task chairs in front of a wood panel wall.
Quiet zone seating in front of a striped feature wall, with the shelving stacks beyond.
Acoustic ceiling clouds in green, yellow and white with cylinder pendants.
Wood slat ceiling and linear light fixtures over the Middle Years area.
Reading seats by the window behind a wood slat screen, North Vancouver City Library.
Red wall with tree branch and bird cut-outs above the children's shelving.
Grey tree cut-out with owl and geese silhouettes on the red feature wall, beside the shelving.
Curved run of children's shelving around a round reading table, with the red feature wall beyond.

The Brief

A Middle Years area for kids in grades 4 to 7, built into the main-floor children's area of North Vancouver City Library. Enduro delivered it as general contractor on a fixed-price contract won through the City of North Vancouver's tender, building to Space Design Inc.'s drawings. The tender required the library to keep its regular hours through construction. Substantial performance was certified in September 2026.

ClientCity of North Vancouver
Scope TypePublic library interior renovation
LocationNorth Vancouver City Library, North Vancouver, BC
Interior DesignerSpace Design Inc.
SectorMunicipal
Completed2026
DeliveryGeneral contractor, fixed price
PermitsElectrical (City of North Vancouver)

Read the case study: A Middle Years Area for Kids in Grades 4 to 7

Scope of Work

  • Hoarding and selective demolition — temporary dust-proof hoarding closed off the work area from the rest of the library before selective demolition began.
  • Two zones for grades 4 to 7 — an active zone for group work, gathering and public computers, and a quiet zone with soft seating for reading and study.
  • Acoustic ceiling clouds — felt ceiling clouds over both zones to take the edge off the noise in a high, open room, installed with a new lighting package and pendants.
  • Shelving taken down and put back — the existing cantilever shelving was dismantled and reinstalled in a new layout with added shelving, to an engineer-sealed layout, after the floor was scanned at every new shelving location.
  • Millwork and feature walls — display panels, pony walls and shelving end panels, a feature wall and a wood slat wall.
  • Power for the active zone — power poles and floor raceway to bring power to the group tables and computers.
  • Floors and finishes — new carpet tile and rubber base, and painting throughout the area.
  • Furniture — new furniture procured and placed to the furniture specification, with some existing furniture moved and reused.

Library Renovation  ·  Public Building Interior  ·  Occupied-Building Work  ·  Acoustic Ceilings  ·  Metro Vancouver