Commercial Tenant Improvement · Metro Vancouver
Vancouver Tenant Improvement Contractor
Enduro builds and manages commercial tenant improvements across Metro Vancouver, British Columbia — office, retail, lab, healthcare and municipal fit-outs — as your general contractor or your construction manager. One accountable team from permit to handover.
- Licensed BC builder
- WorkSafeBC registered
- Bondable & insured
- Metro Vancouver & Fraser Valley
On this page
A commercial tenant improvement (TI) is the construction that turns a leased space into a working one — demolition, framing, mechanical, electrical, plumbing, glazing, millwork and finishes inside an existing building. Enduro delivers TIs across Metro Vancouver, BC as a general contractor (we hold the prime contract and manage the trades) or as a construction manager (we run it owner-side, open-book). Either way, one company is accountable from the first estimate to the finished, permitted space.
01What a commercial TI includes
Scope varies with the space and the use, but a Metro Vancouver commercial tenant improvement usually pulls from the same set of trades. Enduro coordinates all of them under one contract and one schedule:
- Demolition & strip-out of existing partitions and services
- Steel-stud framing & drywall — new demising and interior walls
- Structural alterations — openings, reinforcement, new roof or floor penetrations
- Electrical — distribution, power, lighting and controls
- Mechanical / HVAC — units, ductwork, ventilation and controls
- Plumbing — washrooms, kitchenettes and specialty fixtures
- Fire protection & life-safety — sprinkler, alarm and exit systems
- Interior & storefront glazing — demising glass, doors and feature walls
- Millwork & casework — reception, counters and built-ins
- Ceilings & acoustic treatment — grid, drywall and sound control
- Flooring & wall finishes — paint, tile, resilient and specialty finishes
- Doors, frames & hardware — including access control
- Data, low-voltage & audio-visual (AV) integration
- Signage & wayfinding coordination
- Accessibility upgrades to the BC Building Code
- Permits & code coordination with the City and consultants
- Commissioning & testing of systems before handover
- Closeout, warranty & O&M documentation
02General contractor or construction manager — which fits
Enduro delivers tenant improvements two ways. The right one depends on how settled your design is and how much of the process you want to hold yourself.
We build it
General Contracting
Enduro holds the prime contract and manages the subcontracted trades as your single point of contact — carrying the build from a priced estimate through demolition, rough-in and finishes to a verified, handed-over space.
Best when the design is settled and you want one firm accountable for budget, schedule and quality.
We manage it
Construction Management
Enduro works owner-side — validating the budget, testing buildability, running an open-book trade tender and controlling cost and schedule on your behalf. You keep control of the money and the decisions.
Best when design is still moving and you want an early, open-book hand on cost and buildability.
Simply put: GC to build it, CM to steer it. Not sure which? Tell us where your project stands and we'll give you a straight recommendation — see our plain-language CM-or-GC guide.
03How a Vancouver TI runs, step by step
A tenant improvement in Metro Vancouver lives and dies on its permits and coordination — pouring the work is the straightforward part. Here is how Enduro runs one:
-
Feasibility & budget
We walk the space, test your program against the base building and lease, and give you an early, honest number — so you know what fits before design gets expensive.
-
Design coordination
We work alongside your architect and consultants, cross-checking drawings for buildability and code — BC Building Code, accessibility, and where a change of use raises the building's Hazard Index and triggers deeper review.
-
Permits & approvals
Most commercial interiors need a City of Vancouver building permit, with trade permits usually rolled into it. Minor work in eligible office buildings can use the City's Tenant Improvement Program fast-track. Before demolition, we coordinate the WorkSafeBC-required hazardous-materials (asbestos) survey by a qualified person.
-
Procurement & long-lead
We lock trade and material commitments at agreed prices and place long-lead orders — switchgear, custom millwork, specialty equipment — early, so nothing stalls your finish date.
-
Construction
Subcontracted trades are sequenced and managed under one contract, with a super on site running trades, deliveries and safety day to day. We file the WorkSafeBC Notice of Project where the work requires it, and check quality as it's installed.
-
Closeout & warranty
We work the deficiency list to zero, prove HVAC, electrical and life-safety systems, and hand over the keys with as-builts, warranties and O&M manuals so your facilities team can run the space.
04What a tenant improvement costs in Vancouver BC
Fit-out cost is driven by the level of finish and how much base-building and mechanical work the space needs.
| Fit level | Typical scope |
|---|---|
| Cosmetic refresh | Paint, flooring, minor finishes, like-for-like swaps |
| Standard fit-out | New office or retail layout — partitions, ceilings, lighting, MEP, millwork |
| High-end / specialized | Labs, clinics, food service, flagship retail — heavy MEP, containment, premium finishes |
Base-building condition, mechanical and electrical scope, permit-driven upgrades and finish level move the real number in either direction.
Enduro prices off real drawings when they exist and builds an open-book budget with you when they don't — then confirms the number in writing after a site visit. For where 2026 costs are heading, read our Vancouver fit-out outlook.
05How long it takes
Construction is often the shorter part of the calendar — design coordination and City of Vancouver permitting usually drive the overall schedule. Typical planning ranges for a Metro Vancouver commercial TI:
| Phase | Typical duration | Notes |
|---|---|---|
| Feasibility & pricing | 1–2 weeks | Site walk, early budget, go / no-go |
| Design & coordination | 3–8 weeks | Depends on scope and consultant turnaround |
| Permit processing | 3–10+ weeks | City of Vancouver; shorter for eligible offices under the TI Program fast-track, longer with change of use or structural work |
| Procurement / long-lead | 2–8 weeks | Runs alongside design and permitting |
| Construction | 6–16+ weeks | By size, finish level and MEP complexity |
| Closeout & warranty | 1–2 weeks | Deficiencies, commissioning, handover documents |
The most common cause of a slipped schedule isn't the City's queue — it's an incomplete permit application going back for rework. We front-load the survey, the drawings and the scope to keep that from happening. See the Vancouver TI permit guide.
06Building while you stay open
Many Metro Vancouver tenant improvements happen in occupied space — a floor that's still working, a store that's still trading, a lab that can't shut down. Enduro phases these builds so your operation keeps running:
How we build around a live operation
- After-hours & weekend scheduling for the loud, dusty and disruptive work
- Phased construction — the space handed back to you zone by zone, on a plan agreed up front
- Dust, noise & negative-air control — hoarding, sealed work areas and filtration to protect staff and product
- Exits and life-safety kept live — egress, alarm and sprinkler coverage maintained throughout
- Coordination with building management and neighbouring tenants on access, elevators and shutdowns
It's the operational proof behind a fit-out: the difference between a build that shuts you down and one that lets you keep the doors open. We built inside a working UBC research lab around live growth chambers — the same discipline applies to an operating office or store.
07Recent tenant improvements
A few Metro Vancouver fit-outs Enduro has delivered across office, retail and research-lab space:
08Tenant improvement FAQ
How much does a commercial TI cost in Vancouver BC?
A cosmetic refresh keeps most of the existing layout and services; a full office or retail fit-out adds new partitions, ceilings, lighting and MEP; labs, clinics and food-service spaces add specialized systems and equipment. The existing building, services and finish level determine the actual number, which Enduro confirms from drawings and a site visit. These are scope bands, not a quote — Enduro confirms your number in writing after a site visit.
How long does a TI take in Metro Vancouver?
A straightforward office fit-out often runs a few months end to end. Construction itself is typically 6–16+ weeks, but design coordination and City of Vancouver permitting usually drive the overall schedule.
Do I need a permit for a tenant improvement in Vancouver?
Most commercial interior renovations do — the common triggers are moving interior walls, changing how a space is used, or altering plumbing, electrical, gas or mechanical systems. Trade permits usually roll into the building permit. Truly cosmetic work often needs nothing. Confirm current rules with the City and your consultants.
What's the difference between a tenant improvement and a leasehold improvement?
They're the same work from two angles. "Tenant improvement" (TI) is the construction term for building out a leased space; "leasehold improvement" is the accounting and lease term for those fixed alterations. The scope Enduro builds is identical.
Who pays for a TI — is there a tenant improvement allowance?
It depends on the lease. Landlords often provide a TI allowance — a set dollar amount per square foot toward the build — with the tenant funding anything above it; some deals are turnkey. Enduro works for either the landlord or the tenant, and our written estimate shows exactly where the allowance lands against real scope.
Should I hire a GC or a construction manager for my fit-out?
Hire a general contractor when the design is settled and you want one firm to hold the contract and hand you a finished space. Hire a construction manager when you want to stay owner-side with an open-book budget while design is still moving. GC to build it, CM to steer it — Enduro offers both.
Can you build while we stay open?
Yes. We schedule disruptive work after hours, hoard and seal the work area, run dust and negative-air control, keep exits and life-safety live, and phase the build so your team keeps working and your doors stay open.
Does Enduro self-perform the trades?
No. Enduro is the prime contractor and construction manager — we hold the contract, plan and sequence the work, run daily site control and quality, and manage the subcontracted trades as your single point of accountability. One company answers for budget, schedule and the finished space.
Are you licensed and insured to work in BC?
Yes — Enduro is a licensed BC builder, bondable and insured, and WorkSafeBC registered. On commercial work we file the WorkSafeBC Notice of Project where required and coordinate any hazardous-materials survey the demolition scope calls for.
What areas do you serve?
Metro Vancouver, the Fraser Valley and Sea-to-Sky — including Vancouver, Burnaby, Richmond, Surrey, North and West Vancouver, the Tri-Cities, Pitt Meadows, Squamish and Chilliwack.